Delivering to

Why you’ll love it

RestaurantSupply.com is your trusted source for Steelite fine china rarebit dishes.

  • Authorized Steelite dealer, ensuring genuine commercial tabletop and manufacturer support
  • Fast shipping available on in-stock Steelite DCI528W fine china rarebit dishes
  • Competitive pricing backed by a 30-day price match guarantee
Additional Question? Ask an Expert
$443.02/Case

Delivery to:

Why you’ll love it

RestaurantSupply.com is your trusted source for Steelite fine china rarebit dishes.

  • Authorized Steelite dealer, ensuring genuine commercial tabletop and manufacturer support
  • Fast shipping available on in-stock Steelite DCI528W fine china rarebit dishes
  • Competitive pricing backed by a 30-day price match guarantee
Additional Question? Ask an Expert

Steelite DCI528W 12 Oz Welsh Rarebit Dish Oblong Lead-Free Ceramic with Rolled Edge - 1 Dozen

Steelite  |  MFG #: DCI528W  |  Item #: 757458
Item: #757458

Technical details
Manufacturer Steelite International
Model Number DCI528W
Manufacturer Part # DCI528W
Construction Ceramic
Capacity 12 Oz
Height 1.38"
Width 10.25"
Depth 5"
Weight 18.74 lbs
UPC 008449528017

About this item

Product Details

The Steelite DCI528W Welsh Rarebit Dish 12 Oz., part of Steelite International's distinguished line of ceramic serveware, is engineered for professional foodservice applications requiring precise capacity and durable craftsmanship. This oblong dish measures 10" in length, 5" in width, and 1-3/8" in height, featuring a rolled edge for enhanced stacking and handling. Fully vitrified, it ensures resistance to thermal stress and consistent performance in high-temperature environments. Built from high-quality lead-free ceramic, it is both oven and microwave safe, facilitating versatile reheating and presentation. Designed for specialty dishes such as Welsh Rarebit, this dish supports precision portion control and presentation in commercial kitchens. Its technical specifications highlight its suitability for rigorous use, combining functionality with durability in a streamlined form factor.

Top Steelite DCI528W Features

The Steelite DCI528W Welsh Rarebit Dish is tailored for restaurant-grade service, offering ample capacity for rich sauces and toppings. Its fully vitrified ceramic construction ensures longevity under daily oven and microwave cycles, while a plain, rolled edge simplifies cleaning and stacking. Designed for consistent portioning, this oblong ware integrates seamlessly into food prep and presentation workflows, particularly in casual dining and upscale bistros. The dish’s resistant, lead-free ceramic material minimizes chipping and staining, ideal for high-frequency use in commercial kitchens.

  • Material: Fully vitrified ceramic for enhanced durability and thermal resistance
  • Capacity: 12 oz. volume accommodates rich toppings and sauces
  • Construction: Oven and microwave safe, lead-free ceramic simplifies reheating
  • Design: Oblong shape with rolled edge ensures stability and stackability
  • Ease of Maintenance: Plain surface facilitates cleaning, reducing downtime in service

Ideal for countertop, banquet, or specialty dish presentation in commercial foodservice environments.

Steelite DCI528W Technical Specs

The Steelite DCI528W Welsh Rarebit Dish features a model number DCI528W and is constructed from high-quality ceramic with a fully vitrified design that guarantees resistance to chipping and thermal cycling. It measures 10.25" in width, 5" in depth, and 1-3/8" in height, with a weight of approximately 19.84 lbs per case. This dish's tough, lead-free ceramic is microwave safe, supporting rapid reheating processes. Its dimensions are optimized for standard gastronorm and service presentation, making it suitable for countertop use or stacking in storage. The dish is designed to withstand typical operational temperature ranges and is ideal for serving specialty dishes in higher-volume operations. Additional features include a plain finish, robust rolled edges, and compatibility with standard commercial ware handling protocols.

  • Construction: Fully vitrified ceramic with a rolled edge for strength and stacking ease
  • Dimensions: 10.25" L x 5" W x 1-3/8" H for precise portioning
  • Weight: 19.84 lbs per case, robust for daily commercial use
  • Material Safety: Lead-free, microwave safe, durable ceramic for prolonged use
  • Temperature Tolerance: Suitable for oven and microwave operations, high thermal stability
  • Power Requirements: Not applicable (manual, non-electric)
  • Material Compatibility: Compatible with standard commercial dishwashing routines
  • Usage Environment: Suitable for countertop, serving stations, or stackable storage
  • Operational Range: Designed for temperatures up to high thermal cycles in commercial kitchens
  • Maintenance: Easily cleaned, dishwasher compatible, scratch-resistant surface

What is a commercial rarebit dish

A commercial rarebit dish refers to a specialized servingware designed for individual portions of Welsh Rarebit or similar savory dishes, typically crafted from durable ceramic materials suitable for high-volume foodservice operations. The Steelite DCI528W Welsh Rarebit Dish is a 12 oz. capacity, oven and microwave safe ceramic piece with an oblong shape and rolled edges, engineered for professional kitchens requiring uniform presentation and easy handling. Used primarily in casual dining, upscale bistros, or hotels, this dish supports efficient serving and reheating of hot, rich toppings, making it ideal for restaurant or catering environments with moderate to high throughput.

Top Rarebit Dishes for Foodservice Operations

Designed for moderate-volume kitchens, the Steelite DCI528W Welsh Rarebit Dish provides durable, oven-safe serveware for specialty dishes, supporting seamless workflow and presentation in professional foodservice environments. Steelite International’s quality construction ensures consistent performance with a compact footprint suitable for busy establishments like cafes and upscale bistros.

  • Operation Type — suited for countertop preparation stations
  • Kitchen Type — ideal for compact commercial spaces
  • Foodservice Category — suitable for casual dining and upscale restaurants
  • Workload Qualifier — supports moderate throughput environments
  • Use Case — effective for serving hot toppings and sauces

Why Choose Steelite DCI528W?

Why Choose Steelite DCI528W Welsh Rarebit Dish? This model distinguishes itself through its fully vitrified ceramic construction, robust rolled edges, and precise capacity designed for professional service. Its lead-free, microwave and oven-safe materials offer reliable performance in demanding kitchen environments, improving operational efficiency and presentation standards compared to competitor models with less durable ceramics or improper sizing.

  • Compact footprint supporting efficient countertop use
  • Oven and microwave safety for versatile reheating
  • Enhanced durability with fully vitrified ceramic
  • Simple cleaning and stacking features improve workflow
  • Design optimized for specialty dish presentation and portion control

Customer reviews

Steelite DCI528W Welsh Rarebit Dish 12 Oz. 10"L X 5"W X 1-3/8"H
Steelite International

Steelite DCI528W 12 Oz Welsh Rarebit Dish Oblong Lead-Free Ceramic with Rolled Edge

$443.02

Steelite International, DCI528W, Welsh Rarebit Dish, 12 oz., 10"L x 5"W x 1-3/8"H, oblong, rolled edge, plain, fully vitrified, oven & microwave safe, lead-free, ceramic, White (stock item) (Packed By: 1 Dozen)