Groen 81621 32 Inch Long Lead Reed Switch Assembly Groen Steamer
Delivery to:
- High-temperature, corrosion-resistant materials enhance durability
- Precisely actuates steam control with 32-inch leads
- Compatible with Groen C/2-e, C/2-g, Cc20-e, Cc20-g models
- View More Details
Best Price Guarantee
Best Price Guarantee
Secure Shopping
Secure Shopping
Groen 81621 Reed Switch Assembly, 32" Long Leads, Groen Steamer C/2-e C/2-g Cc20-e Cc20-g
Product Description
Groen 81621 Reed Switch Assembly, 32" Long Leads, Groen Steamer C/2-e C/2-g Cc20-e Cc20-g
